New Construction Waterproofing Sydney | Waterproofing for Builders & Developers | Sydney One Waterproofing
New construction waterproofing in Sydney
New Construction Waterproofing Specialists in Sydney

New Construction Waterproofing in Sydney for Builders & Developers

Waterproofing faults are one of the leading causes of building defects, and the cheapest time to get them right is during the build. Sydney One Waterproofing delivers licensed, compliant new construction waterproofing for builders and developers across Sydney, from below-ground tanking to podium decks and wet areas, integrated with your program and certified to Australian Standards, backed by a 10-year workmanship warranty.

Request A Quote

Tell us about your project. We will get back within 24 hours.


Licensed & Insured
NSW Fair Trading certified
24/7 Emergency Support
Urgent leak response
10-Year Warranty
On every completed job
500+ Projects Done
New builds & developments
New Construction Waterproofing Sydney

Build It Right With Professional New Construction Waterproofing

On a new build, waterproofing is a small part of the budget but a leading cause of defects when it is rushed or value-engineered out. A membrane installed incorrectly, a below-ground system that ignores the water table, or detailing missed around penetrations all surface as leaks, rectification works and disputes after handover, exactly when they are most expensive to fix.

We integrate waterproofing into the build from the planning stage, coordinating with builders, hydraulic engineers and certifiers so the right systems, drainage and detailing are designed in rather than retrofitted. Every system complies with the NCC, AS 3740 and AS 4654, and we provide membrane specifications, inspection records and certification to support occupation certificate and DBPA requirements.

Why New Construction Waterproofing

The Benefits of Getting Waterproofing Right From the Start

Integrating professional waterproofing during construction is one of the highest-return decisions on any project. Here is what it delivers for builders and developers.

Prevent Water Damage

Waterproofing faults are a leading cause of building defects. Getting the membranes, tanking and detailing right during the build stops water ingress before it ever reaches the structure or finishes.

Avoid Costly Rectification

Fixing waterproofing after handover means opening up finished work. Building it in correctly the first time avoids rework, callbacks and disputes that erode project margins.

Enhance Structural Integrity

Properly tanked substructures and sealed slabs prevent the water ingress that corrodes reinforcement and degrades concrete, protecting the structural integrity of the finished building for the long term.

Defect-Free Handover

Dry, sealed wet areas, balconies and basements mean fewer defects at inspection and a cleaner handover, protecting your reputation with owners, purchasers and certifiers.

AS-Compliant Protection

Every system complies with the NCC, AS 3740 and AS 4654, with membrane specifications, inspection records and certification that support occupation certificate, DBPA and Declared Design requirements.

On-Program Delivery

We coordinate with your site team and stage works to fit the build sequence, so waterproofing is installed at the right point without holding up the construction program.

What We Waterproof

New Construction Waterproofing Services for Every Stage of the Build

From below-ground tanking to podium decks and wet areas, we install integrated waterproofing systems across every stage of your Sydney construction project.

Discuss Your Project

Below-Ground & Tanking

Substructure and below-ground tanking designed with the hydraulic engineer to handle the water table and hydrostatic pressure, protecting basements and foundations from day one.

Get a quote →

Podium Decks

Podium and roof deck waterproofing to AS 4654, with the right membrane, falls and detailing to protect the occupied spaces below from water ingress over the building's life.

Get a quote →

Basements & Car Parks

Negative and positive-side membrane systems for new basements and car parks, integrated with drainage and waterstops to keep below-grade levels dry and usable.

Get a quote →

Balconies & Terraces

External balcony and terrace membranes installed to AS 4654 with correct falls and termination detailing, engineered for Sydney's weather and UV exposure.

Get a quote →

Wet Areas & Internal

Bathroom, laundry and internal wet area membranes installed to AS 3740 with continuous coverage and correct falls, the most inspected waterproofing in any new build.

Get a quote →

Water Tanks & Retaining Walls

Concrete tanking for water tanks, retaining walls and structural elements, creating a durable, watertight barrier built into the structure of your project.

Get a quote →

Lift Pits & Plant Rooms

Specialised waterproofing for new lift pits, plant rooms and service areas, creating a robust barrier that protects building services and equipment from water damage.

Get a quote →

Compliance & Certification

We work to the NCC, AS 3740 and AS 4654, coordinate with certifiers, and provide specifications, inspection records and certification for occupation certificate and DBPA requirements.

Get a quote →
500+
New Build Projects Completed
10+
Years of Industry Experience
4.9★
Average Google Review Rating
10
Year Workmanship Warranty
Professional vs DIY

Why Builders Build Waterproofing In From the Start

On a build, the cost of getting waterproofing wrong is measured in rectification, callbacks and reputation. Here is how integrating it from the start compares to fixing it after handover.

Built In From the Start

  • Compliant with the NCC, AS 3740 and AS 4654 from the build stage
  • Specifications, inspection records and certification for OC and DBPA
  • Backed by a written 10-year workmanship warranty
  • Right materials, correctly applied, the first time
  • Coordinated with engineers and certifiers, staged to your program

Fixed After Handover

  • Risk of non-compliance flagged at certification or inspection
  • Defect claims and disputes with purchasers after handover
  • Opening up finished work to access failed membranes
  • Below-ground fixes that are difficult and costly to retrofit
  • Rework, callbacks and margin erosion down the track
Our Process

How We Waterproof Your New Build

A clear, four-step process that takes the guesswork out of protecting your property.

1

Inspection & Assessment

We review the plans and specification with the builder and hydraulic engineer, and advise on the right systems, falls, drainage and detailing before work starts.

2

Detailed Quote

You receive a documented scope with membrane specifications, staging that fits the construction program, and a clear, no-obligation quote priced into the build.

3

Professional Application

Our team prepares each substrate and installs the membrane and tanking systems to Australian Standards at the right point in the sequence, integrated with concrete and drainage works.

4

Handover & Warranty

We complete inspections, provide compliance documentation and certification for occupation and DBPA requirements, and hand over your written 10-year workmanship warranty.

What Our Customers Say

Trusted by Sydney Builders & Developers

Real feedback from Sydney builders, developers and project managers we have partnered with on new construction projects.

"Brought them in at the design stage for the below-ground tanking on our development. Worked seamlessly with our hydraulic engineer and hit every program milestone. Certification was spot on at handover."

A
Andrew K.
North Sydney · Developer

"We use them across all our new builds now. Podium decks, wet areas and basements all done to spec, staged around our trades, and never a defect flagged at certification. Reliable every time."

D
David M.
Parramatta · Builder

"Handled the full waterproofing package on our multi-storey project, from substructure tanking to balconies. On budget, on program, and the documentation made certification painless. Highly recommend."

S
Sarah L.
Chatswood · Project Manager
Beyond New Builds

We Also Protect Residential, Commercial & Strata Properties

New construction is a specialty of ours, but our licensed crews also deliver tested systems for residential, commercial and strata projects across Sydney.

Discuss Your Project

Residential

Homes, townhouses and renovations. Compliant waterproofing for bathrooms, balconies, kitchens and laundries.

Commercial

Offices, retail, warehouses and high-rise. Scalable crews and minimal disruption with after-hours options across Sydney.

Strata

Apartment complexes, common property and remedial works. We coordinate with strata managers and committees from inspection to certification.

New Construction

Builders and developers trust us to integrate code-compliant waterproofing from the build stage across new builds and large-scale developments.

On-site new construction waterproofing quote in Sydney
On-Site Inspection

Get An On-Site Quote Today

One of our licensed waterproofers will review your plans, identify the right systems for the build, and provide a documented scope and quote priced into your project with no obligation.

Call us
+61 470 300 561
Email us
info@sydneyonewaterproofing.com.au

Request A Quote

We respond within 24 hours, Monday to Saturday.


FAQ

New Construction Waterproofing FAQs

Common questions about waterproofing your Sydney construction project. Still curious? Our team is one call away.

Talk to a Specialist
Waterproofing faults are one of the leading causes of building defects in Australia. Getting it right from the construction stage protects the structure, avoids costly rectification and disputes after handover, and keeps the project compliant for certification and insurance.
As early as possible. Below-ground and substructure waterproofing in particular is best planned at the design stage alongside the hydraulic engineer, so the right systems, drainage and detailing are built in rather than retrofitted. We work to the project specification and construction program.
We install below-ground and substructure tanking, basement and car park membranes, podium decks and balconies, planter boxes and retaining walls, water tanks, lift pits, and internal wet area membranes, integrating each with the concrete, drainage and structural works.
Yes. We work to the NCC, AS 3740 and AS 4654, coordinate with certifiers and engineers, and provide membrane specifications, inspection records and certification suitable for occupation certificate and DBPA requirements, including External Waterproofing Declared Designs where required for Class 2 buildings.
Yes. We coordinate closely with builders, site supervisors, hydraulic engineers and certifiers, and stage our works to fit the build sequence so waterproofing is installed at the right point without holding up the program.
Yes. Sydney One Waterproofing is licensed with NSW Fair Trading, carries public liability insurance, and complies with the NCC, AS 3740 and AS 4654 on every construction project, with full documentation provided for your build.